A Presentation on Kota Super Thermal Power Station | PPT
2. Introduction of Kota Super Thermal Power Plant It was established in 1983. It is located at the left bank of the Chambal river at the upstream of the Kota Bairage. 1st and 2nd units are of 110 MW each. 3rd, 4th and 5th units are of 210 MW. 6th and 7th units are of 195 MW. Total generation capacity : …
